NEWS

  • December 08, 2009 Based on the results of RUSSIANTESTING ORGANIZATION inspection, a new version of Delta-SI developed by JSC SPIK SZMA for automation of metrology services has shown its compliance with AIS Metrcontrol.

  • December 04, 12 Organization quality systems audit for assessment of conformity ISO 9001:2008 requirements was performed by the auditors of ACERT Bureau. The quality management system was certified according to the requirements of ISO 9001:2008. This certificate assures that SPIK SZMA has the processes and tools to develop quality products that meet customer needs and requirements. More details in Quality Management

  • November 26, 2009 Three medium voltage motors manufactured by OOO Leningrad Electric Machine Engineering Plant (Saint-Petersburg) upon the request of JSC SPIK SZMA passed factory tests and were shipped to the end user according to the contract for complete delivery of ventilation motor control system for ZAO Vorgashorskaya Mine 2. Simultaneously the automated fan unit control system as a part of this project was tested.
    The control system was designed and manufactured at the companys assembling facility and realized on the controllers V2000 by Toshiba.

  • November 24, 2009 November 24, 2009 Companys specialist, professor Mozhaev A. S. gave a report at the seminar in R&D centre Industrial safety November 24, 2009 The seminar on hazard analysis and technogenic risk assessment in Russian scientific researches took place on the 23rd of November in R&D centre Industrial safety. Senior specialist of SPIK SZMA, Alexander Mozhaev, Professor gave a report: Theory, application experience and tendency of general logic probabilistic method and software "ARBITR" complex for automated structural logic simulation and assessment of the system reliability and safety measures.
    The scientific seminar is held twice a year in Moscow; its objectives are discussion and approbation of new tendency in researches on industrial safety and technosphere safety. Event reporting (Rus)

  • October 27, 2009 Kirill Sorokin, the engineering department specialist, has done a three-week training called "Advanced Field Devices and Control" in Tokyo as a part of long-term cooperation with Japan Cooperation Center, Petroleum.
    The training was related to experience of distributed control system implementation in oil refineries in Japan.

  • September 10, 2009 The management of Toshiba International Corporation (S. Akiba, President, and M. Ayers, General Manager) paid a call on the office and the assembling facility of the company on the 8th, 9th of September. The meeting about current and prospective issues of licensed production of Toshiba drives in Russia was held on the 8th of September.

  • September 2, 2009 Project designing for retrofit of the compressor control system (CC-201, CC-301 for the plant LC-6U#2) was completed under the contract with Mozyr Oil Refinery.
    Up-to-date PCS7 system by Siemens will be installed instead of the existing Simatic S5. Besides, unit antisurge protection was provided. In accordance with the project, SPIK SZMA assembled and carried out FAT of the new control system at its Assembling Facility, the system was further delivered to the Customer for installation. The control system will be replaced during scheduled repair of the plant.

  • August 20, 2009 On August 18, 2009, Oil & Gas Quality Group, Energy Division of Siemens AG conducted an audit of SPIK SZMA's Assembling Facility in order to accredit SPIK SZMA as an official supplier of Siemens control systems. The Assembling Facility has shown its full compliance with Siemens requirements.
  • June 29, 2009 SPIK SZMA will take part in the International Research and Practice Conference on power savings of the heat utilities. The conference is held on July 9, 2009 at the Institute of Complex Development and Training Krona (University of Plant Polymers). SPIK SZMA specialists will deliver a report on "Toshiba Products Application for Energy and Resource Savings".
  • May 24, 2009 On May 25, 2009, SPIK SZMA together with NPP Elektroprom (city of Cheboksary), its regional dealer in Povolzhskiy Federal District, will held a seminar on the Up-to-date TOSHIBA and TMEIC Power Equipment: VSDs, Starters, Vacuum Circuit Breakers and Contactors. Toshiba International Corporation and TMEIC specialists will make the presentations.
    To attend the seminar please contact us by e-mail lavrelektro@mail.ru, info@szma.com
    To get more information on the next seminars, please contact us by e-mail info@szma.com
  • May 23, 2009 SPIK SZMA took part in the 16th international fair Energy and Electrotechnics'2009.
  • April 23, 2009 SPIK SZMA will take part in the 16th international fair Energy and Electrotechnics'2009 to be held to be held on May 19-22 in St.Petersburg in Lenexpo Exhibition Hall. SPIK SZMA and Toshiba International Corporation specialists will work together at SPIK SZMA booth. We are happy to present Toshiba and TMEIC low and medium voltage drives, soft starters, industrial sensors and flowmeters. Besides, you can see SCD drives manufactured by SPIK SZMA under Toshiba International Corporation license. You can also see custom software ARBITER developed by SPIK SZMA for reliability calculations of technically complex power supply control systems. Please visit our booth #D15, pavilion 7.
    Email: info@szma.com
  • April 13, 2009 At the request of Kirishi Oil Refinery, the Federal Agency for Technical Regulation and Metrology has tested SPIK SZMA's software - Automated system for metrological equipment accounting (ASUMO), version 3.0 - for meeting the Requirements for the metrological firmware compliance with Rostechregulation's automated inspection results accounting system. Proceeding from testing results, the Federal Agency for Technical Regulation and Metrology confirmed compliance of ASUMO software (version 3.0) to the above mentioned requirements, therefore, this software may be used by the metrological groups authorized to provide the equipment inspection on their own with further submitting the results to Rostechregulation's automated accounting system.
  • February 25, 2009 SPIK SZMA won the tender held by Severstal Resource for delivery of the motor control system of the main ventilation unit #4 at Vorgashorskaya mine (Vorkutaugol JSC). The scope of delivery includes two medium-voltage invertors TMdrive-MV by TMEIC (Japan), three medium-voltage motors, and an automation & control system. The project designing (in cooperation with Giproshakht designing institute) and system delivery will be provided till the end of 2009.
  • January 23, 2009 On January 20-22, 2009, a workshop was held in SPIK SZMA training center devoted to the up-to-date Toshiba low and medium voltage power equipment: soft starters, vacuum circuit breakers and contactors. The information was presented by Toshiba International Corporation (TIC) and SPIK SZMA specialists. These products are used for various applications and are supplied to CIS countries within the framework of SPIK SZMA and TIC joint project - Tosma. At SPIK SZMA training center, the seminars and trainings on power equipment and automation systems are held on a regular basis. To get more information on the next trainings, please contact +7 (812) 350-7879, +7 (812) 647-0387 or e-mail info@szma.com
  • January 14 2009 On January 20-22, there will be a seminar on soft starters and vacuum contactors held in the training center of SPIK SZMA's Assembling Facility. The products will be presented by the specialists of Toshiba International Corporation with SPIK SZMA being TIC's authorized integrator.
    For more information please contact +7 (812) 350-7879 or +7 (812) 647-0397.

News 2008    News 2007    News 2006    News 2005    News 2004    News 2003


PRESS RELEASE


05.03.2008 SPIK SZMA launched a new Web-site www.tosma.ru devoted to joint project of SPIK SZMA and Toshiba International Corporation (TIC).

13.04.2007 SPIK SZMA launched a new Web-site www.rayvoss.ru including all information about lightning protection and surge suppression devices.

30.10.2006 Toshiba International Corporation and SPIK SZMA: the same views for the future of their business

14.12.2006 SPIK SZMA: TOSHIBA electrical equipment will assembled in Saint-Petersburg.

14.09.2006 Grand opening ceremony of SPIK SZMAs assembling facility within the framework of TOSHIBA seminar in St.Petersburg

 

SPIK SZMA 1998-2016. All rights reserved.